PPP DBFMOT toll bridge project designed to accommodate both regular traffic and BRT public transport in non-segregated lanes. The project features a 15.8 km elevated highway extending from Safut intersection (North) to Naour intersection (South), integrating public transport through 13 BRT stations and pedestrian bridges. It includes two lanes in each direction and operates under a toll system